Steps to Build with SABS TechnologyPowered by Taj Innovations
- Nesrin Karam
- May 9
- 4 min read

Thank you for your interest in building with SABS technology—a cutting-edge composite solution for creating fire, wind, and earthquake-resistant
homes.
Taj Innovations is proud to represent Strata International Group in
the Southern California market. We are here to guide you through every
step of the building process and provide all the materials you'll need for
your future home. Below is an outline of the typical process for building
with SABS. Please note that each project is unique, and this guide is
designed to help simplify and streamline your journey.
1. Design Phase
You have two main options when beginning your home design:
• Option 1: Have Strata handle both architectural and structural
design. The complete design package is $8.25/sq ft.
• Option 2: Work with your own architect. Once plans are complete,
we submit them to Strata for conversion into the SABS system. This
conversion costs $5.25/sq ft.
* To save time, a drafter can create initial floor plans, which can then be
submitted to Strata. A complete design typically takes 4 to 8 weeks,depending on the client's preferences for home style and layout. We can
propose a candidate.
Next Steps:
• Once you are ready, Taj will gather your documents and forward
them to Strata.
• Strata will schedule a conceptual design meeting to define the
project’s “under-roof” square footage.
• A contract will follow, then an invoice. Design work begins once
payment is made to Strata International.
2. Permitting Phase
After plans are finalized, you can:
• Submit them yourself as an Owner-Builder, or
• Have your contractor submit them.
*Owner-submissions may help expedite municipal approval.
Taj and Strata will support you through the permitting process and respond
to any questions from local municipalities. Additional services such as Title
24, soil testing, grading, surveying, solar, and utilities
coordination may also be required—these can be handled by either you or
your contractor.
3. Infrastructure & Foundation
Once permits are approved:
• You may need soil tests, grading plans, and surveys based on
your land and local requirements.
• Your contractor will prepare and pour the foundation (including
plumbing, electrical rough-ins, and waterproofing).
• Foundation curing time is 28 days.
To stay on schedule, notify Taj as soon as foundation work
begins. We’ll coordinate materials delivery, so everything arrives
on time.
Once contractor begins the work on the foundation, it is essential to
promptly notify Taj Innovations. This ensures that building materials are
delivered on schedule and that no delays occur in the construction timeline.
Upon receiving notification, Taj will draft the contract to order the
materials. After the contract is signed, an invoice will be issued. Oncepayment is received, the materials will be ordered and scheduled for
delivery to the site, timed appropriately for installation following the
completion of the foundation pour.
4.Contractor Certification & Training
To ensure quality control, all contractors using the SABS system must
complete a certification training provided by Taj and Strata.
Training Details:
• When: Last Monday–Wednesday of each month, 9am–4pm
• Where: 28104 Avenue Crocker, Valencia, CA 91355
• Cost: $5,500 for up to 3 participants; $300 for each additional
person
• Includes: Breakfast, lunch, and hands-on construction of an 8x8
unit
If you don’t have a contractor, we are happy to recommend one we trust.
5. Foam Construction Phase
• Contractors will start cutting and assembling foam components based
on the SABS cut sheet.
• Stem walls, exterior walls, and the roof will be built within 2–3 weeks
of the foundation pour.
• Windows and doors openings will be cut into the foam and prepped
for installation.
6. Sabscrete Phase
• Contractors apply Sabscrete from top to bottom, starting with the
roof and exterior walls.
• Simultaneously, electricians and plumbers install internal
components. Alongside with the Fire sprinkler system.
• After electrical and plumbing are complete, foam openings are
patched, and walls are prepped and coated internally.
7. Finishing Phase
With Sabscrete completed, your contractor can begin the finishing process:
• Kitchens, bathrooms, flooring, paint, and final installations proceed
as with any traditional home build.
• Once complete, you may apply for your Certificate of Occupancy.8. Taj’s Role
Taj Innovations will:
• Connect you with certified SABS contractors or certify your chosen
contractor.
• Guide you through the design process.
• Supply all SABS materials (foam, adhesive, polymer, Sabscrete).
• Oversee the entire process from start to finish.
• Ensure all team members fulfill their responsibilities effectively.
• Conduct quality control at every phase of construction.
• Assist with permitting and municipal processes.
We hope this guide gives you a clear idea of the SABS building process.
Every home and jurisdiction are unique, and we’re here to help you
navigate any challenges along the way to building your dream home.
Our mission is to ensure a seamless experience, allowing you to focus on
creating meaningful memories while taking pride in having built your
dream home—one that brings lasting comfort and joy for years to come.
Please feel free to reach out with any questions.
Warm regards
Taj Innovations